SOFFIT INSTALLATION SET FOR MONDAY 7/12/04

GUTTER INSTALLATION 6" W/GUARDS SET FOR WED. 7/14 & 7/15 WEATHER PERMITTING

GRANITE WAS MEASURED; AWAITING INSTALLATION

DOUG BUSY STAINING DOORS 7/9/04

DAY TIME CLOTHES CLOSET/NIGHT TIME CLOTHES CLOSET

KNICK KNACK ALCOVE

ANN/LYNN: PLEASE REVIEW AND CALL US

STRAY CAT WE FOUND IN YOUR NEW BACKYARD. DO YOU WANT US TO KEEP FOR WHEN YOU RETURN?

JOSH'S RETREAT

SCOTT IS ON VACATION!

FIREPLACE REFRAMED FOR MORE STONE

Auntie Em - Auntie Em

A reminder of home!

Bobby is currently installing your porch posts 7/13/04.

Granite top installed this morning 7/13/04 on right wall.

Close up of granite.

Fireplace mantel built and installed 7/12/04.

Scott installing whirlpool tile. Shower tile is next. Scheduling Quinn Glass for Monday to measure and propose.

Josh's Room

Jay busy working in only cool area of house. Heat index currently 104 degrees on 7/13/04.

Acid stain samples.

Waiting for replacement cabinet prior to remaining granite being installed

KBL delivered lights on Friday 7/9/04.

Stair railings.

Aunt Diane's lot.

Doug painting posts 7-14-04

Whirlpool tile finished 7/14/04

Scott working on tile in master shower 7/14/04

Porch posts finished 7/14/04

Upgraded fluted trim around french doors.

Pivot shower door measurement done 7/19/04

Dog run foundation installed 7/16/04

Gutters installed 7/19/04. Clay matches PURRRRRRFect!

Sitting room fixture hung

Tile completed in upstairs bath.

Foyer fixture

Hardware hung

Wagenbach starting prep work for the additional concrete.

Back panel installed. Two of three island lights humg.

Crown Molding Started in Kitchen

Lighting up in kitchen and nook

Upstairs lights

Ann's fan

Josh's cool new fan and work progressing on desk

Josh's bath

We finally got him

Diane's foundation

Wagenbach forming up sidewalk

Jason with skid loader

Lynn's new steps.

Jay sealing Khristie's sidewalk.

Crown molding completed 7/29/04.

Sink set 7/29/04 and granite finished.

Josh's desk is progressing.

Diane's dig 7/29/04.

Floor poured in dog run 7/29/04.

Brian's crew working on deck 7/29/04.

Main part of Ann's driveway poured 7/29/04.

Pool liner installed 7/29/04.

Dog kennel behind Lynn's.

Wagenbach team pouring motor home pad 7/29/04.

The whole crew is here 7/29/04.

Lynn's steps are in 7/29/04.

Deck installation underway 7/29/04

Stone Firplace Installed 7/30/04

Bobby installing flashing 8/3/04.

Pool filled up.

Whirlpool filling up 8/3/04.

Lots of concrete.

Deck in progress 8/3/04.

Fireplace completed along with cabinetry.

Oil rubbed bronze knobs installed 7/30/04.

Carpet installed 8/2/04.

Master Bathroom Fixtures Installed.

Master Bathroom Fixtures Installed.

Carpet installed.

Front sidewalk formed and ready for concrete.

Front sidewalks poured 8/3/04.

Brian's crew progressing on deck.

Dog run formed and ready for concrete 8/5/04